Product Details

Encompix

Aptean logo
Encompix
Compare All Aptean Software
Back to Product Overview

Supply Chain Management for Encompix

Advanced Planning & Scheduling Module

Advanced Planning & Scheduling (APS)

The Encompix Advanced Planning and Scheduling module is based on Theory of Constraints (TOC) concepts eliminating the restrictions of older generation MRP-based scheduling systems. 

One of your constraints might be the amount of space required for assembly. In other cases, you may have available machines to do the work, but no available operators. Encompix allows for multiple constraint management with a variety of scheduling options and analysis reports. 

APS allows you to plan your production based on your business policies (customer priority, least slack time, reduced set-ups, order due date etc.). APS takes into account constraints such as capacity, materials, tooling and labor pool to determine the best” possible schedule. You can run APS in simulation mode, with or without material constraints to see the effect of various scenarios before committing the production plan. The planning board display shows visually the capacity vs. load profile, and, with drag-and-drop features, allows the user to model changes interactively.

Encompix Modules

Pricing Request Demo Request White Paper Request

Please complete the fields below to receive your confirmation email Please complete the fields below to receive your confirmation via email To download your white paper, complete fields below. Check your inbox for the white paper link..

Congratulations, you're a step closer to finding the right ERP System.

A confirmation email from Top10ERP.org is on its way to your inbox. This email will include information on the resources you requested.

Thank you for visiting Top10erp.org. We greatly value hearing from our visitors. Please share your comments, questions and feedback regarding your experience on Top10ERP.org.